Understand Cost Control

Compare forecast and actual wages, hours, and sales, broken down by stream and measured against your budget.

Written by Aurelian Bodea

Cost Control is your central view for tracking labour performance across your organisation. It consolidates wage spend, hours, and sales for each site or department, broken down by cost stream — such as Wet and Dry for a restaurant or Front of House and Back of House.

For multi-site or multi-department organisations, use the site picker at the top of the page to navigate between locations. You'll also see any notable events and a 14-day rolling weather forecast displayed in context alongside your data.

📌 Note: Find out more in our spotlight session Conquering cost control.


The five key metrics

Cost Control is divided into three core sections — Forecast, Actual, and Variance — alongside an optional Budget column. Each section displays five key metrics, broken down by stream:

  • Hours — hours scheduled or actually worked.

  • Sales — expected or actual sales.

  • Wages — expected or actual wage cost, including employer uplifts such as NI contributions, pension, holiday smoothing, and any individual wage uplifts. See Wage cost calculations for a full breakdown.

  • Wage % — labour costs as a percentage of sales.

  • Productivity — sales divided by labour hours, showing the revenue generated per hour worked. Commonly used by retail businesses.

A Cost Control chart is also available, giving a visual day-by-day representation of the data. Use the chart settings to select which metrics to display.


Rotaready prediction

If Predictive Analytics is enabled for your organisation, this section appears above the Forecast and shows a daily sales prediction for each stream for the next 7–14 days. You can review how the prediction was calculated and optionally copy it into your forecast. See Predictive Analytics for more information.


Forecast

The Forecast section shows what you planned to spend on wages and what you anticipated receiving in sales before the week began.

For sales, you can enter or update your forecast at any point — sales forecasts are typically added around a week in advance, just before building the rota, and can consider factors like planned events, bookings, and the weather forecast. Always use net sales — sales exclusive of VAT or the prevailing local sales tax. Entering sales forecasts before or during rota creation allows Rotaready to calculate wage percentages in real time, based on scheduled hours, employee pay rates, and the entered sales forecast. To input your forecasted sales, click on the blue figures in the Sales section (beneath the hours).

⚠️ Important: Always enter net sales. Entering gross figures will cause inaccurate wage percentages and reporting.

If your sales forecast fields are locked or read-only, this is because your sales are either pulled through automatically from an EPOS integration, or sales mappings are in place. In this case, sales must be entered or updated in the source site or department where they originate.

For hours and wages, figures are populated automatically when a rota is published — Rotaready takes a snapshot at that point. These figures are then fixed, representing the expected hours and wages before any real-world variables occur. If your organisation uses rota approval, forecast hours and wages are also visible when a rota is marked for approval.

🤓 Tip: When typing figures in the grid, press Tab to jump to the next cell, just like a spreadsheet.


Actual

The Actual section is populated based on what really happened, updated continuously throughout the day and week.

For sales, you can enter figures manually. If an EPOS integration is enabled, sales will populate automatically — indicated by a Σ symbol next to the figures — and will be read-only.

For hours and wages, figures are derived as follows:

  • Future days — displays forecast labour or current rota values, depending on your preferences.

  • Today — updated in real time from clock-in and clock-out records, or copied from the forecast depending on your preferences.

  • Past days — calculated using an intelligent method that combines rota shifts with actual attendance records, accounting for overtime, no-shows, and absences such as sickness.

  • Signed-off days — once a day or week has been signed off, the signed-off figures are locked as the final confirmed hours and wages for payroll.


Variance

The Variance section shows the difference between your Forecast and Actual figures, and is colour-coded:

  • Green — positive performance: labour hours saved, sales exceeded forecast, wage costs reduced, or wage percentage improved.

  • Red — underperformance: more hours used than forecast, sales below expectations, wage costs increased, or wage percentage risen.

See Understand forecast vs actual variances if your figures don't look as expected.


Budget

The Budget column shows your weekly labour budget set via the budgeting tool. It's colour-coded against the adjacent Forecast or Actual column — green when performing in line with or better than budget, red when underperforming.


Wage percentages

Wage percentages show labour costs as a proportion of sales and are calculated automatically. By default, an overall wage percentage is shown for the site or department. Custom wage percentages can also be configured to provide more granular breakdowns — for example, separate FOH and BOH wage percentages, each calculated against total sales.

📌 Note: Custom wage percentages are configured by the Rotaready support team. Get in touch if you'd like to set these up or make changes.


Sales mappings

If your Rotaready environment has multiple departments per site — for example, Front of House and Back of House — you may want both departments to show the same total sales figure so wage percentages are calculated correctly. Sales mappings automate this by pulling sales entered in one department into one or more others automatically, avoiding manual duplication and preventing double-counting in aggregated reports.

Sales entered via a mapping appear as read-only in the destination department — they can only be edited in the source department where they were originally entered. If you need to change your mappings, contact the Rotaready support team.

📌 Note: Sales mappings do not apply to budgets. Each department operates with its own independent budget.


Compare figures

The Compare figures button lets you compare your current Forecast and Actual figures against a previous week, month, or year. You can add up to three comparable periods, which appear as colour-coded rows alongside your current data — useful for refining forecasts and assessing performance against historical periods.


Cost Control settings

Click the settings icon in Cost Control to access four menus:

  • Show sections — toggle visibility of the Variance section, Productivity rows, Budget column, decimal places, abbreviated values, and rows with zero values.

  • Row density — adjust display spacing: Compact, Comfortable, or Standard.

  • Pin sections — freeze the Forecast, Actual, and Variance headers so they stay visible whilst scrolling.

  • Preferences — control what figures appear in the Actual section for today and future days before real data is available. For example, you can choose to show forecasted sales for future days, giving you a running weekly total as the week progresses.


Aggregated totals

The Aggregated totals tool is the right place to view labour costs across a full month (or any custom date range), either combined across all sites and departments or broken down individually. It shows the same Forecast, Actual, Budget, and Variance figures as Cost Control — including Wage % — but is not restricted to a single week. Use it when you need monthly payroll spend, a multi-week labour summary, or a period-level comparison between budget and actual.

  1. Click Cost Control in the main navigation.

  2. Click Aggregated totals.

    🤓 Tip: Aggregated totals is the recommended tool for Heads of Department who need monthly payroll spend or wage percentage at a glance — the weekly Cost Control view is not required for this.